Plug-In Solar Laws Compared

ProvisionUtahHB 340MarylandHB 1532VermontS. 202MaineLD 1730ColoradoHB 26-1007
The law
BillHB 340the Solar Power AmendmentsHB 1532the Utility RELIEF Act (Chapter 353)S. 202an act relating to plug-in photovoltaic devices (Act 149)LD 1730An Act to Make Small Plug-in Solar Generation Devices Accessible for All Maine Residents to Address the Energy Affordability Crisis (Chapter 644)HB 26-1007an act concerning measures to improve a customer’s ability to use distributed energy resources
StatusSigned into lawSigned March 2025Signed into lawSigned May 12, 2026Signed into lawSigned June 16, 2026Signed into lawSigned April 6, 2026Signed into lawSigned May 7, 2026
In effectMay 7, 2025July 1, 2026July 1, 2026July 15, 2026August 12, 2026
What you can install
Wattage cap1,200 WMaximum output1,200 WMaximum output back to building1,200 WCombined inverter capacity per meter1,200 WCombined inverter output per service address1,920 WMaximum output to the grid
Lower thresholdNone391 WUL product-listing exemptionNone420 WInstall-it-yourself limit391 Wsmall-device exemption
How it connectsStandard 120V AC outletStandard electrical outletPlugs into a regular outletPlugs into a regular outletPlugs into a regular wall outlet
CertificationUL or equivalent NRTL certifiedUL or equivalent nationally recognized testing laboratoryUL 3700, or an equal certification from a recognized testing labIt also has to be set up to meet IEEE 1547, the safety standard for connecting to the grid, using the default settings.UL 3700, or a comparable certification from a recognized testing labThe law also counts a system configured to the National Electrical Code that Maine adopts by rule, but no product is sold as meeting that on its own.Labeled and listed by a nationally recognized testing laboratoryFrom January 1, 2027, a device over 391 watts cannot be sold, leased, or rented in Colorado unless it is UL labeled and listed.
National Electrical CodeMust meet the current codeNot requiredNot requiredNot requiredNot required
Shuts off in an outageRequiredNot requiredRequiredRequiredRequired
Your utility
Utility approvalNot requiredNot requiredNot requiredNot requiredNot required
Utility noticeNot requiredRequiredBefore you install the systemNot requiredRequiredYou must notify your utility within 30 days of installing a system over 420 wattsOnly if your utility requires oneYour utility can require a notice of the device and its size in kilowatts
Utility feesNot allowedNot allowedNot allowedNot allowedNot allowed
Interconnection agreementExemptExemptExemptExemptExempt
Net meteringNot eligibleNot eligibleNot eligibleNot eligibleNot eligible
Utility liabilityUtility not liable for the deviceUtility not liable for the deviceNot in the lawUtility not liable for the deviceUtility not liable for the device
Renters, HOAs, and local rules
Renters can installNot in the lawThe landlord still decidesNot in the lawThe landlord still decidesYes, a landlord cannot ban itNot in the lawThe landlord still decidesYes, a landlord cannot ban itFrom January 1, 2027
HOAs and deed restrictionsNot in the lawAn HOA can still say noNot in the lawAn HOA can still say noCannot ban itNot in the lawAn HOA can still say noCannot ban itFrom January 1, 2027
Local zoningNot in the lawLocal rules still applyNot in the lawLocal rules still applyCannot regulate itNot in the lawLocal rules still applyNot in the lawLocal rules still apply
Read more
State guideUtah guideMaryland guideVermont guideMaine guideColorado guide
Bill textHB 340 ↗HB 1532 ↗S. 202 ↗LD 1730 ↗HB 26-1007 ↗

Working on a bill in your state? View the interactive map to see where plug-in solar stands, or browse advocacy resources.

This page summarizes state laws for general information and is not legal advice. Verify details with your utility and the official bill text before installing.